My Modern Home

March 16, 2008

After Paint pictures

Filed under: Uncategorized — mymodernhome @ 10:06 pm

After PaintWell, everything is going well. Drywall is going strong (almost done), paint inside to start soon, tile starts tomorrow. We have water in the house, and hope to have pre-power soon!

Here is a picture of an after paint (pic taken 3/15/08).

February 25, 2008

PAINT!

Filed under: Uncategorized — Tags: — mymodernhome @ 2:15 pm

Thanks to all this weekend. 1/2 of the stairs are done, most of the insulation is done, and the first coat of paint is done!! House looks amazing!

Here is a short video of some of the painting. More Pics to follow later.

paint1.jpg

paint2.jpg

February 15, 2008

How long has it been since my last update??

Filed under: Construction — mymodernhome @ 8:41 pm

stucco and windowsAnyway…. had some delays, still working…. Electrical rough in inspection is done. Roofing supposed to be done today, floor starts downstairs on Monday. Here are some pictures after the windows went in, as well as the stucco.

I also have a couple of my concrete countertops…

Before Stucco

Lath

bathcounter.jpg

half bath

December 24, 2007

Some pics

Filed under: Uncategorized — mymodernhome @ 7:57 pm

Inside plumbing rough in is almost done. Tubs are installed, huge holes cut in slab. Drying in and windows supposedly today??? Merry Xmas to all!!!

pict0167a.jpg

James, this one if for you…..

November 11, 2007

Updates, updates!

Filed under: Construction — mymodernhome @ 5:09 pm

houseup2.jpghouseup.jpghouseup4.jpgIncredible amount of work this week. Top framing outside done, trusses all up.. starting to look like a house!!

Boxing in and all framing should be done by late monday, so the electricians and plumbers will start work. Maybe Xmas?? Hopefully!!

Here’s some pics…..

houseup3.jpg

November 5, 2007

How Long has it been now?

Filed under: Uncategorized — mymodernhome @ 9:46 pm

Yes, it has been a while… it is like watching concrete cure!!

Trusses are up for the second floor, kitchen is stripped, so is the old bathroom. Breaking apart a cast iron tub is a lot of fun. Here is a litte bit of advice. Wear eye AND ear protection . The Coating of the tub goes everywhere on the first whack, and it sounds like you are in a bell tower when you hit it for the first time.

Walls for 2nd floor supposed to be going up this week!

October 9, 2007

Finally an update!

Filed under: Construction — mymodernhome @ 1:54 pm

Sorry no updates lately. Have been a little slow due to finishing up the tie beam and having to do some adjustments to the truss plans. Trusses supposed to be delivered on Wednesday, and start gong up there as well… Hopefully that will be what happens!!

August 8, 2007

And it continues

Filed under: Uncategorized — mymodernhome @ 11:36 pm

Garage is almost all walled up. Tie beam plywood is starting to be placed, kitchen cabinets came down. It is funny how they look fine when they are in place, but when they are taken off, they look really ratty. Looks like it is going to be another trip to IKEA!!

Здравствуйте! Darma!

Sveiks! Yuri

Tervist		Marco
    

pict0005c.jpg
pict0009c.jpg
pict0003d.jpg

pict0016c.jpg

August 7, 2007

And a little more!

Filed under: Uncategorized — mymodernhome @ 11:40 pm

By request…..

pict0001c.jpg

pict0004c.jpg

August 6, 2007

And more brick..

Filed under: Uncategorized — mymodernhome @ 11:48 pm

More brick going up… looking great!! Date is Aug 6.

pict0004b.jpg

pict0006b.jpg

pict0007b.jpg

Older Posts »